Self-serve funnel health and cohort retention across Free, Pro and Scale. Activation = a workspace publishes its first loop within 7 days of signup.
Pro converts 1.6× Free at the “built first loop” step — the template gallery ships to Free workspaces behind the gallery-for-free flag on Aug 3.
Nightly sync clean — 214,506 loop runs ingested. Re-mapped 2 accounts after the Ferrostar domain migration; no metric restatement needed.
Wk-4 retention KPI is now the seat-weighted cohort average (was a simple mean) after the board review — big Scale cohorts no longer get diluted.
Added the Scale plan split. Scale cohorts before May 11 are back-filled estimates from billing records; treat them as directional.